01Tower foundations
All tower civil works, from excavation to backfill, in every kind of ground.
- Setting out, excavation and de-watering
- Stubs, reinforcement and concreting
- Pile foundations and pile caps
- Backfilling and tower earthing
Foundations · Erection · Stringing
MRCC connects Pakistan’s power network. Our core work is building 132, 220 and 500 kV transmission lines from the ground up: tower foundations, including pile foundations, tower erection and conductor stringing, along with the grid stations and civil works at either end. We work for the national grid, power distribution companies and EPC contractors, from the Indus plains to the hills of Balochistan and AJK.

Core business
Our core work is building the transmission line itself, from the ground up. Our own crews and equipment handle all three stages on 132, 220 and 500 kV lines, for the national grid, distribution companies and EPC contractors.
01All tower civil works, from excavation to backfill, in every kind of ground.
02Lattice towers and steel tubular poles erected safely and to drawing.
03Tension stringing with our own TESMAC puller and hydraulic tensioner.
How we build a line
About MRCC
MRCC is a transmission line, grid station and civil works contractor focused on power infrastructure. Our teams execute transmission line and grid station works within the stipulated time while meeting every quality parameter, from new lines and river crossings to emergency breakdown and rehabilitation work on lines in service.
To develop lasting, growing relationships with our clients by delivering any transmission line or grid station work in the stipulated time, observing all quality parameters. Excellent quality through honest hard work is how we earn our clients’ trust.
Openness and honesty in how we do business, with clear reporting of both our successes and where we can improve.
“To us success is not a destination, it is a journey and we are focused on it.”

Message from the CEO
A transmission line is a connection: power station to grid, grid station to grid station, and in the end, power to the homes and industries that depend on it. For more than three decades, MRCC has been making those connections, and we treat every one as a promise to our client.
I founded MRCC in 1991 on a simple belief: honest work, careful planning and respect for the people in the field are what earn a client’s trust. That belief still guides every site we run, whether we are stringing a new 500 kV line or restoring a damaged tower on a line that must stay in service.
The connections we build rarely run through easy places. They cross rivers, deserts and mountain terrain. That is where our people have proved themselves, from pile foundations at river crossings to emergency restoration on the national grid, delivered on time, to specification and safely.
Everything we have achieved has come through the grace of Almighty Allah, the prayers of our parents and the dedication of the MRCC team. To our clients, thank you for your continued trust. To those planning their next project, we would be glad to show you what our team can do.
Nasir Ahmed Panhwar — Chief Executive Officer
Expertise
One contractor for the full line: route survey and soil investigation, pile and conventional foundations, tower erection, stringing and sagging, testing and commissioning, and the grid station at either end.
Featured project · Rare specialist work · River crossing on piles
An exclusive MRCC project and rare work in the field: pile foundations built inside the Indus floodplain. Locations 42 to 57 of the 132 kV single-circuit double-tower line between New Rohri and Sukkur Site cross the Indus floodplain. MRCC built a causeway to reach each location, drilled bored piles, cast the pile caps and tower foundations between the river channels, then erected the towers and strung ACSR Rail conductor over about 2.9 km.








Featured project · Rare specialist work · Pile foundations
When Grid Station Dokri was converted from 66 kV to 132 kV, the waterlogged ground could not carry conventional footings. The control house and switchyard were designed on special pile foundations, and MRCC drilled and cast the bored piles on site with its own reverse rotary rig. Piling inside a working grid station is work few contractors in the field take on.









Featured · 500 kV emergency rehabilitation · Client NTDC
In April 2024 three SJG-type towers, locations 37, 38 and 39, collapsed on the 500 kV Dadu–Shikarpur Circuit-II. MRCC cleared the twisted steel, rebuilt the three towers with cranes, re-hung the insulator strings, restrung the quad-bundle conductors, welded the nuts and bolts and handed the circuit back. NTDC re-energised the line.


The collapse · April 2024





The rebuild




Project spotlight
About 110 km of 220 kV single-circuit double-tower line with twin-bundle Rail conductor, built between 2019 and 2022. MRCC carried out the civil works, tower erection, stringing, testing and commissioning.









Ongoing
Contracts currently under execution.
Foundations, erection, stringing, testing & commissioning
RCC pile foundations for tubular poles, erection, stringing, EMMP · See photos
Completed projects
A selection of our completed work in three areas: transmission lines, grid stations and civil works. Full experience records are available to clients on request.
Line works
132, 220 and 500 kV lines, from twin and quad-bundle construction to river crossings and emergency tower restoration.
Tower erection and construction as approved sub-contractor.
Civil works, erection, stringing, testing and commissioning. See photos
Both circuits over about 50 km: civil works, erection, stringing, testing and commissioning.
Piling, foundations, erection and ACSR Rail stringing across the Indus. See photos
Interconnection scheme for back-feed energisation of Engro Power Plant (Thar).
Grid works
Electrical works at 132 kV grid stations, including a full 66 to 132 kV conversion.
Equipment foundations on special pile design, switchyard trenches, transformer way and switchyard electrification. See photos
Equipment erection, control cabling, testing and commissioning.
Erection, protection, wiring, testing and commissioning.
Civil works
Buildings and infrastructure at operating grid stations, and municipal works.
Bored piles, control house building and switchyard fencing. See piling photos
Road works inside an operating 220 kV grid station.
Cat-IV (D-type) flats with water supply and sewerage.
Where we work
From the Makran coast to Islamabad, and from the Indus floodplain to the hills of Balochistan, MRCC has built and restored lines and grid stations in every province. Larger pins have photo galleries; tap one to see the photos. Smaller pins mark our other line, grid and civil works since 1991.
Capacity
MRCC owns the machinery to survey a route, drill bored piles, cast foundations, erect towers and string quad-bundle conductor, and mobilises it to wherever the project is.
Credentials
Clients








Leadership
Engineers and technically trained staff with long field experience on high voltage lines.
Nasir Ahmed PanhwarChief Executive Officer
Muhammad Furqan NasirDirector ProjectsWe hire engineers, surveyors, foremen and skilled line crews for projects across Sindh, Punjab, Balochistan and AJK. Send your CV to info@mrcc.pk.
Contact
Send tender documents, BOQs or site enquiries. Office hours are Monday to Friday, 9:00 am to 5:00 pm.
Bungalow No. A-91, Dehli Muslim Society, Shikarpur Road, Sukkur, Sindh
Open in Google Maps →38 E-1, Johar Town, Lahore, Punjab
Open in Google Maps →