Home / Projects / Transmission lines

Transmission line works

132, 220 and 500 kV lines, from twin and quad-bundle construction to river crossings, re-routings and emergency tower restoration.

Featured

Selected projects

A selection of our completed work. Full experience records are available to clients on request.

500 kV · Quad bundle

500 kV D/C quad-bundle lines: Port Qasim–Hub/Jamshoro and 95–145 km near Domeli

Tower erection and construction as approved sub-contractor.

Clients
ICC · MREC
Years
2016–17
220 kV · Twin bundle

220 kV Uch–Sibi T/L (about 110 km)

Civil works, erection, stringing, testing and commissioning. See photos

Client
SDEPCI for NTDC
Built
2019–22
220 kV · D/C

220 kV D/C T/L from RLNG Power Plant, Trimmu (Jhang) to 220 kV G/S Toba Tek Singh

Both circuits over about 50 km: civil works, erection, stringing, testing and commissioning.

Client
NTDC
Completed
2018
132 kV · River crossing

132 kV New Rohri–Sukkur Site and Liberty–Deharki–Guddu river crossings

Piling, foundations, erection and ACSR Rail stringing across the Indus. See photos

Client
SEPCO
500 kV · Emergency rebuild

500 kV Dadu–Shikarpur Circuit-II, Tower 109 rehabilitation

Damaged tower cut away and rebuilt through the night after a windstorm; line accepted and re-energised. See photos

Client
NGC
Year
2025
132 kV · Bored piles

132 kV SDT Sakrand–Nawabshah, locations 46–61

Bored pile foundations, erection and stringing through farmland with a high water table. See photos

Client
HESCO
Year
2025
132 kV · Re-routing

132 kV Dadu–K.N. Shah re-routing at Cadet College Kakar

GPS survey, RCC pile and conventional foundations, erection, stringing, testing and commissioning. See photos

Client
SEPCO
Year
2026

500 kV · Emergency rehabilitation · Client NGC

500 kV Dadu–Shikarpur Circuit-II

Tower No. 109 (type SJG) of the 500 kV Dadu–Shikarpur Circuit-II was brought down by a heavy windstorm and rain on 3 October 2025. MRCC mobilised cranes, gas-cutting crews and erection gangs to cut away the damaged steel and rebuild the tower, working through the night. The line was completed, accepted and re-energised by NGC.

Line
500 kV Dadu–Shikarpur Ckt-II
Work
Tower 109 (SJG) rebuilt
Status
Completed & energised
Client
NGC, T/L(M) Shikarpur
Lifting the tower top section into place at night
Erection crew climbing a rebuilt 500 kV tower at night
Re-erecting the tower body overnight
Floodlit 500 kV tower under erection with crew on the members
Floodlit erection work
Gas-cutting the damaged tower steel with a crane holding the section
Cutting and removing the damaged tower
MRCC management and engineers inspecting the site beside tower sections
Senior management on site with the engineers
Engineers discussing next to conductor bundles laid on the ground
Planning conductor work at the location
Team reviewing tower sections laid out on the ground
Reviewing the tower sections before lifting

500 kV · Emergency rehabilitation · Client NTDC

Three collapsed 500 kV towers rebuilt on Dadu–Shikarpur

In April 2024 three SJG-type towers, locations 37, 38 and 39, collapsed on the 500 kV Dadu–Shikarpur Circuit-II. MRCC cleared the twisted steel, rebuilt the three towers with cranes, re-hung the insulator strings, restrung the quad-bundle conductors, welded the nuts and bolts and handed the circuit back. NTDC re-energised the line.

Line
500 kV Dadu–Shikarpur Ckt-II
Scope
3 SJG towers, locations 37–39
Status
Completed & energised, April 2024
Client
NTDC · EHV-II Hyderabad
Collapsed 500 kV tower beside its foundation stub after the stormRestored 500 kV tower carrying quad-bundle conductors

The collapse · April 2024

Collapsed 500 kV tower lying beside its foundation stub with insulator strings still attached
Tower down with the insulator strings still attached
Collapsed 500 kV SJG tower lying across a harvested paddy field
SJG tower lying across the paddy field
Buckled 500 kV tower body with an insulator string hanging from the conductor
Buckled tower body, insulator string hanging
Twisted tower leg torn from its concrete foundation stub
Leg torn from the foundation stub
Damaged foundation stub in standing water in front of the collapsed tower
Damaged stub in standing water

The rebuild

Site video, April 2024
Crane holding the rebuilt crossarm of the 500 kV SJG tower
Crossarm going back on with the crane
Tadano crane lifting the crossarm section
Lifting the crossarm section
Crane lifting an insulator string to the crossarm
Raising the insulator strings
Lineman fixing the insulator assembly at the crossarm
Fixing the insulator assembly
MRCC crew on site as the crane raises the crossarm
Crew and crane at the location
Rebuilt tower standing with the crane alongside
Tower re-erected
Running block rigged for the quad-bundle conductor
Running block for quad-bundle stringing
Lineman climbing the new galvanised tower
Final checks on the new steel
Welding the tower nuts and bolts at the stub
Nut-bolt welding at the stubs

Record restoration · After Cyclone Biparjoy · Client NTDC

132 kV Jhimpir-II wind corridor restored in record time

Cyclone Biparjoy brought down towers on the 132 kV double-circuit lines that carry power from the Jhimpir wind farms into the grid. MRCC crews and equipment reached site on 14 June 2023, a day before the Federal Minister for Energy inspected the damage on 15 June and called for the line to be back within days. Working round the clock, MRCC dismantled the four collapsed towers at locations 90 to 93, butt-jointed and jacketed all twelve foundation legs, erected three WPS and one WPA tower, restrung 1.55 km of twin conductor with spacers and dampers, and handed the circuits back for testing. The work was completed on 20 June 2023 and the line from Jhimpir-II to Indus WPP and Liberty-II to Din WPP was energised. The Federal Minister for Energy commended the restoration as completed in record time.

Line
132 kV D/C Jhimpir-II–Indus WPP & Liberty-II–Din WPP
Scope
4 collapsed towers, locations 90–93
On site → energised
14 → 20 June 2023
Client
NTDC · EHV-II
Restored 132 kV tower at Jhimpir with crew on the crossarms
Rebuilt tower with insulator strings and twin conductors back in place
Lineman riding the conductor to fix spacers near Jhimpir wind farms
Fixing spacers on the restrung twin conductor

In the news: Federal Minister for Energy visits the damaged Jhimpir towers, 15 June 2023 (PID) · NTDC restores 132 kV line from Jhimpir wind plants, 20 June 2023 (ARY News)

Completed 2025 · Client HESCO

132 kV Sakrand–Nawabshah

Locations 46 to 61 of the 132 kV single-circuit double-tower Sakrand–Nawabshah line run through irrigated farmland with a high water table. MRCC drilled bored piles with its own rotary rigs, lowered full-length cages by crane, cast the foundations, then erected the towers and strung the conductor across the fields.

Line
132 kV SDT
Section
Locations 46–61
Foundations
Bored piles
Client
HESCO
Stringing conductor across the cotton fields
Rotary piling rig and crane lowering a pile cage beside waterlogged ground
Rig and crane working beside standing water
Crane lifting a full-length pile cage in a wheat field
Full-length pile cage over the wheat
Piling rig and crane at work with cement stacked on site
Drilling and cage placement in one set-up
Rotary piling rig with flush hose drilling a bore
Reverse rotary drilling
Crane setting a pile cage into the bore
Setting the cage into the bore

Completed 2026 · Client SEPCO

132 kV Dadu–K.N. Shah re-routing, Cadet College Kakar

The existing 132 kV Dadu–K.N. Shah line crossed the premises of Cadet College Kakar. MRCC re-routed it outside the campus: GPS route survey, coordination with the college administration, dismantling of the old section, RCC pile and conventional foundations, erection, stringing, testing and commissioning, all coordinated around a working educational campus.

Line
132 kV Dadu–K.N. Shah
Scope
Re-routing (deposit work)
Foundations
RCC pile & conventional
MRCC survey team with GPS receivers on the new route
GPS survey of the new route
Survey set up on the new alignment outside the campus
Setting out the new alignment

Project spotlight

220 kV Uch–Sibi

About 110 km of 220 kV single-circuit double-tower line with twin-bundle Rail conductor, built between 2019 and 2022. MRCC carried out the civil works, tower erection, stringing, testing and commissioning.

Line
220 kV SDT, twin bundle
Length
About 110 km
Built
2019–2022
Owner
NTDC, via SDEPCI
Workers in a deep tower foundation excavation with reinforcement and concrete chute
Tower foundation excavation and concreting
Orange TESMAC conductor puller on site
TESMAC puller set up for stringing
Concrete test cubes beside a compression testing machine
Concrete cube testing for every pour
Engineers and crew under an erected lattice tower
Site team under an erected tower
Puller, tensioner and tractors in the stringing yard
Puller and tensioner in the stringing yard
Forklift unloading insulator crates from containers
Receiving insulators and line material
Full MRCC site crew lined up in helmets and safety vests
Daily safety line-up with the full crew
Completed transmission line towers crossing green farmland
The completed line crossing farmland
MRCC crew in safety gear on the 220 kV Uch–Sibi line site
Our crew on the 220 kV Uch–Sibi line

Our history

Earlier line works, 1991–2012

Before the projects above, MRCC spent two decades building, repairing and restoring 66 and 132 kV lines for WAPDA, NTDC, HESCO and GEPCO, from the Quetta hills to the Thar fringe, much of it emergency breakdown work done at short notice.

  1. 1993
    • Carriage of tower material from Sukkur to the Dera Murad Jamali and Kashmore storage yards · WAPDA
  2. 1998
    • 132 kV Guddu–Kashmore–Kandhkot: tower foundations · WAPDA
  3. 1999–2000
    • 132 kV D/C Industrial-II–Mariabad, Quetta: survey, hill cutting, foundations, erection, stringing, testing & commissioning · NTDC · JV
    • 132 kV D/C Qilla Abdullah–Chaman: tower erection and stringing · NTDC · JV
  4. 2001
    • 132 kV Kandhkot–Shikarpur: nut-bolt welding and anti-rust painting · WAPDA
  5. 2003–2004
    • 132 kV S/C Thull–Hairdin: tower erection, stringing and emergency foundation repair · NTDC
    • 66 kV in & out feed for Gandakha: tower foundations and welding · NTDC
    • 132 kV Sanghar–Mirpurkhas: welding on 220 towers · NTDC
    • 132 kV Shikarpur–Dokri–Rato Dero: emergency tower foundations · NTDC / HESCO
  6. 2006–2007
    • 132 kV Hala Road–Jamshoro Indus river crossing: chimney re-concreting, erection of three Chenab-type towers and stringing · HESCO · JVRiver crossing
    • 132 kV K.N. Shah–Rehmani Nagar: tower foundations and stringing · NTDC / HESCO
    • 132 kV SDT Nawabshah–Daur: tower foundations and welding · HESCO · JV
    • 132 kV Shikarpur–Humayoun: welding and stringing · HESCO
    • Emergency breakdown works on the Daharki–Ubauro, Guddu–Kashmore–Kandhkot, Shikarpur–Rato Dero, Naushahro Feroze–Moro and Sukkur Arain Road–Sukkur Site lines · HESCOEmergency
  7. 2008
    • 132 kV SDT Mirpurkhas–Samaro: tower foundations and stringing · HESCO
    • 132 kV SDT Samaro–Umerkot: tower foundations, stringing and welding (2008–2010) · HESCO
  8. 2009
    • 132 kV D/C Dadu–Qazi Ahmed–Sakrand river crossing: 220 kV-type towers rebuilt and six Cardinal conductors restrung · HESCORiver crossing
    • 132 kV D/C TPS Naudero–Rato Dero: tower foundations, erection and stringing · HESCO
    • 132 kV D/C Nokhar–College Road, Gujranwala: erection, stringing, testing & commissioning · GEPCO
    • 132 kV feed for Mehrabpur: erection of 220 kV-type towers · HESCO
    • 132 kV T.M. Khan–Bulri Shah Karim: line rehabilitation · HESCO
    • 132 kV D/C Dadu–Moro and Dadu–Qazi Ahmed: welding and anti-rust works · HESCO
  9. 2010
    • 132 kV D/C feed for Shah Ladhani: friction-type bored pile foundations · HESCOPiling
    • 132 kV SDT Badin–Golarchi: tower foundations · HESCO
    • 66 kV in & out feed for Kunri: tower foundations · HESCO
  10. 2010–2012
    • 132 kV Tando Allahyar–Chamber, 27 km, World Bank financed: survey, foundations, erection, stringing, testing & commissioning · HESCO

Talk to us about your project

Send tender documents, BOQs or site enquiries to our team.