500 kV D/C quad-bundle lines: Port Qasim–Hub/Jamshoro and 95–145 km near Domeli
Tower erection and construction as approved sub-contractor.
- Clients
- ICC · MREC
- Years
- 2016–17
220 kV Uch–Sibi T/L (about 110 km)
Civil works, erection, stringing, testing and commissioning. See photos
- Client
- SDEPCI for NTDC
- Built
- 2019–22
220 kV D/C T/L from RLNG Power Plant, Trimmu (Jhang) to 220 kV G/S Toba Tek Singh
Both circuits over about 50 km: civil works, erection, stringing, testing and commissioning.
- Client
- NTDC
- Completed
- 2018
132 kV New Rohri–Sukkur Site and Liberty–Deharki–Guddu river crossings
Piling, foundations, erection and ACSR Rail stringing across the Indus. See photos
- Client
- SEPCO
500 kV Dadu–Shikarpur Circuit-II, Tower 109 rehabilitation
Damaged tower cut away and rebuilt through the night after a windstorm; line accepted and re-energised. See photos
- Client
- NGC
- Year
- 2025
132 kV SDT Sakrand–Nawabshah, locations 46–61
Bored pile foundations, erection and stringing through farmland with a high water table. See photos
- Client
- HESCO
- Year
- 2025
132 kV Dadu–K.N. Shah re-routing at Cadet College Kakar
GPS survey, RCC pile and conventional foundations, erection, stringing, testing and commissioning. See photos
- Client
- SEPCO
- Year
- 2026
500 kV · Emergency rehabilitation · Client NGC
500 kV Dadu–Shikarpur Circuit-II
Tower No. 109 (type SJG) of the 500 kV Dadu–Shikarpur Circuit-II was brought down by a heavy windstorm and rain on 3 October 2025. MRCC mobilised cranes, gas-cutting crews and erection gangs to cut away the damaged steel and rebuild the tower, working through the night. The line was completed, accepted and re-energised by NGC.
- Line
- 500 kV Dadu–Shikarpur Ckt-II
- Work
- Tower 109 (SJG) rebuilt
- Status
- Completed & energised
- Client
- NGC, T/L(M) Shikarpur






500 kV · Emergency rehabilitation · Client NTDC
Three collapsed 500 kV towers rebuilt on Dadu–Shikarpur
In April 2024 three SJG-type towers, locations 37, 38 and 39, collapsed on the 500 kV Dadu–Shikarpur Circuit-II. MRCC cleared the twisted steel, rebuilt the three towers with cranes, re-hung the insulator strings, restrung the quad-bundle conductors, welded the nuts and bolts and handed the circuit back. NTDC re-energised the line.
- Line
- 500 kV Dadu–Shikarpur Ckt-II
- Scope
- 3 SJG towers, locations 37–39
- Status
- Completed & energised, April 2024
- Client
- NTDC · EHV-II Hyderabad


The collapse · April 2024





The rebuild









Record restoration · After Cyclone Biparjoy · Client NTDC
132 kV Jhimpir-II wind corridor restored in record time
Cyclone Biparjoy brought down towers on the 132 kV double-circuit lines that carry power from the Jhimpir wind farms into the grid. MRCC crews and equipment reached site on 14 June 2023, a day before the Federal Minister for Energy inspected the damage on 15 June and called for the line to be back within days. Working round the clock, MRCC dismantled the four collapsed towers at locations 90 to 93, butt-jointed and jacketed all twelve foundation legs, erected three WPS and one WPA tower, restrung 1.55 km of twin conductor with spacers and dampers, and handed the circuits back for testing. The work was completed on 20 June 2023 and the line from Jhimpir-II to Indus WPP and Liberty-II to Din WPP was energised. The Federal Minister for Energy commended the restoration as completed in record time.
- Line
- 132 kV D/C Jhimpir-II–Indus WPP & Liberty-II–Din WPP
- Scope
- 4 collapsed towers, locations 90–93
- On site → energised
- 14 → 20 June 2023
- Client
- NTDC · EHV-II


In the news: Federal Minister for Energy visits the damaged Jhimpir towers, 15 June 2023 (PID) · NTDC restores 132 kV line from Jhimpir wind plants, 20 June 2023 (ARY News)
Completed 2025 · Client HESCO
132 kV Sakrand–Nawabshah
Locations 46 to 61 of the 132 kV single-circuit double-tower Sakrand–Nawabshah line run through irrigated farmland with a high water table. MRCC drilled bored piles with its own rotary rigs, lowered full-length cages by crane, cast the foundations, then erected the towers and strung the conductor across the fields.
- Line
- 132 kV SDT
- Section
- Locations 46–61
- Foundations
- Bored piles
- Client
- HESCO





Completed 2026 · Client SEPCO
132 kV Dadu–K.N. Shah re-routing, Cadet College Kakar
The existing 132 kV Dadu–K.N. Shah line crossed the premises of Cadet College Kakar. MRCC re-routed it outside the campus: GPS route survey, coordination with the college administration, dismantling of the old section, RCC pile and conventional foundations, erection, stringing, testing and commissioning, all coordinated around a working educational campus.
- Line
- 132 kV Dadu–K.N. Shah
- Scope
- Re-routing (deposit work)
- Foundations
- RCC pile & conventional


Project spotlight
220 kV Uch–Sibi
About 110 km of 220 kV single-circuit double-tower line with twin-bundle Rail conductor, built between 2019 and 2022. MRCC carried out the civil works, tower erection, stringing, testing and commissioning.
- Line
- 220 kV SDT, twin bundle
- Length
- About 110 km
- Built
- 2019–2022
- Owner
- NTDC, via SDEPCI









Our history
Earlier line works, 1991–2012
Before the projects above, MRCC spent two decades building, repairing and restoring 66 and 132 kV lines for WAPDA, NTDC, HESCO and GEPCO, from the Quetta hills to the Thar fringe, much of it emergency breakdown work done at short notice.
- 1993
- Carriage of tower material from Sukkur to the Dera Murad Jamali and Kashmore storage yards · WAPDA
- 1998
- 132 kV Guddu–Kashmore–Kandhkot: tower foundations · WAPDA
- 1999–2000
- 132 kV D/C Industrial-II–Mariabad, Quetta: survey, hill cutting, foundations, erection, stringing, testing & commissioning · NTDC · JV
- 132 kV D/C Qilla Abdullah–Chaman: tower erection and stringing · NTDC · JV
- 2001
- 132 kV Kandhkot–Shikarpur: nut-bolt welding and anti-rust painting · WAPDA
- 2003–2004
- 132 kV S/C Thull–Hairdin: tower erection, stringing and emergency foundation repair · NTDC
- 66 kV in & out feed for Gandakha: tower foundations and welding · NTDC
- 132 kV Sanghar–Mirpurkhas: welding on 220 towers · NTDC
- 132 kV Shikarpur–Dokri–Rato Dero: emergency tower foundations · NTDC / HESCO
- 2006–2007
- 132 kV Hala Road–Jamshoro Indus river crossing: chimney re-concreting, erection of three Chenab-type towers and stringing · HESCO · JVRiver crossing
- 132 kV K.N. Shah–Rehmani Nagar: tower foundations and stringing · NTDC / HESCO
- 132 kV SDT Nawabshah–Daur: tower foundations and welding · HESCO · JV
- 132 kV Shikarpur–Humayoun: welding and stringing · HESCO
- Emergency breakdown works on the Daharki–Ubauro, Guddu–Kashmore–Kandhkot, Shikarpur–Rato Dero, Naushahro Feroze–Moro and Sukkur Arain Road–Sukkur Site lines · HESCOEmergency
- 2008
- 132 kV SDT Mirpurkhas–Samaro: tower foundations and stringing · HESCO
- 132 kV SDT Samaro–Umerkot: tower foundations, stringing and welding (2008–2010) · HESCO
- 2009
- 132 kV D/C Dadu–Qazi Ahmed–Sakrand river crossing: 220 kV-type towers rebuilt and six Cardinal conductors restrung · HESCORiver crossing
- 132 kV D/C TPS Naudero–Rato Dero: tower foundations, erection and stringing · HESCO
- 132 kV D/C Nokhar–College Road, Gujranwala: erection, stringing, testing & commissioning · GEPCO
- 132 kV feed for Mehrabpur: erection of 220 kV-type towers · HESCO
- 132 kV T.M. Khan–Bulri Shah Karim: line rehabilitation · HESCO
- 132 kV D/C Dadu–Moro and Dadu–Qazi Ahmed: welding and anti-rust works · HESCO
- 2010
- 132 kV D/C feed for Shah Ladhani: friction-type bored pile foundations · HESCOPiling
- 132 kV SDT Badin–Golarchi: tower foundations · HESCO
- 66 kV in & out feed for Kunri: tower foundations · HESCO
- 2010–2012
- 132 kV Tando Allahyar–Chamber, 27 km, World Bank financed: survey, foundations, erection, stringing, testing & commissioning · HESCO